Our state-of-the-art, 40-acre campus is an expansive, free-flowing, natural landmark just outside Columbia, SC.

It features lush green spaces, nature trails, walking paths, a gazebo, a turf field, a 5-acre pond, and plenty of inviting indoor and outdoor spaces for campers and visitors to relax, play, grow, and shine.

Fully accessible and ADA-compliant, we opened Phase One of our campus in June 2021 and Phase Two in May 2024.

We opened the 20,000-square-foot Southeastern Freight Lines Activity Center in 2024 to provide more “Inside Magic” space for campers and groups during inclement weather. The Center includes a gymnasium, stage, movement studio, sensory gym, canteen, breakout rooms, staff break room, and two porches.

Designed by Garvin Design Group

Garvin Design Group

Phase One Built by Hood Construction

Hood Construction

& Great Southern Homes

Great Southern Homes

Phase Two Built by Hood Construction

Hood Construction

Made possible by
Shine On Capital Campaign Donors 2018–2021 & Inside Magic Capital Campaign Donors 2022–2024

Camp Cole has taught me that it’s good to give back to others.

Camper, Age 12

This content is blocked because YouTube cookies have not been accepted.

This content is blocked because YouTube cookies have not been accepted.